Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/16/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) AAV AT DISP REQUIRED TO BE 6" ABOVE FL. 2) CLEANOUT MISSING AT HS 3) MIXING VALVES SPECIFIED |
|
| 11/09/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CORRECT SLOPE AND CO PLUGS AT GT AND REMOVE DEMO 2) PROTECT PLASTIC VTRS 3) COMPLETE WORK 4) MAKE VALVES ACCESSIBLE 5) INSTALL DOME STRAINERS 6) SWEEPS AND CO'S REQUIRED ON INDIRECT WASTE 803 7) WATER SUPPLY TO DISPOSER SPECIFIED 8) WATER SUPPLIED EQUIPMENT REQUIRES UNIONS FOR SERVICING 9) SUPPORT PIPING 10) NEED CERTS AND STERILIZATION 11) INSP STOPPED |
|
| 11/08/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |