Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2011 |
ENGINEERING - FINAL |
|
Approved |
Approved |
| 05/18/2011 |
ENGINEERING - FINAL |
|
Denied |
Provide two parking stalls per the approved plan, verify the 14 mesquite trees per approved site plan. |
| 12/15/2010 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Need to remove roll off dumpster, potta potty and temp storage unit from site prio to final. Also remove all construction debris from site. |
| 11/23/2010 |
ENGINEERING - FINAL |
|
Partial Approval |
THE ENGINEERING WILL NOT BE INSPECTED TILL IT IS CALLED IN AND TILL ALL OF THE LANDSCAPING ITEMS HAVE BEEN COMPLETED AND APPROVED. THIS INSPECTION WAS NOT SCHEDULED FOR THIS DATE. |
| 11/18/2010 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Explained that the Engineering CofO inspection should be called in when the site is complete. |