Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/11/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE THERMOMETER PER PLAN AT HOT WATER ENTRANCE TO BLDG 2) INSTALL VALVES PER PLAN ON PANEL LOOP 3) PIPING INSULATION EXPOSED TO SUNLIGHT TO BE PROTECTED FROM SUN LIGHT 4) REMOVE HANDLES ON HOSE BIBS OR PROVIDE HOSE END CAPS OT PREVENT SCALDING |