Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 06/02/2010 | MECHANICAL - FINAL | Cancelled | IVRS - RI canceled | |
| 05/19/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE PROPER DESCRIPTION OF WORK (THIS IS A NEW INSTALL RE-DO PERMIT) 2) PROVIDE ISOMETRIC DRAWINGS FOR GAS PIPING 3) PROVIDE ROOF TRUSS LOAD CALCS 4) PROVIDE GAS LINE PERMITS ON EACH UNIT 5) PROVIDE 2" INSULATION IN ALL EXTERIOR DUCT 6) PROVIDE ELECTRICAL PERMITS BOTH UNITS 7) ALL PVC PIPE AND FITTING JOINTS ARE TO BE PRIMED PRIOR TO GLUE, PRIMER IS TO BE PURPLE IN COLOR PER U.P.C. |
|
| 05/07/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE ACCESS TO ROOF TOP |