Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2012 |
ENGINEERING - FINAL |
|
Approved |
|
| 08/20/2012 |
ENGINEERING - FINAL |
|
Partial Approval |
WAS ABLE TO DISCUSS THIS SITE WITH STEVE SHIELDS FOR THE ZONING SECTION. HE HAS IMFORMED ME THAT THE SIDEWALK HAS BEEN CHANGED TO ALLOWING THE EXISTING ASPHALT TO REMAIN AS IT IS AT THIS TIME. THE CMU WALL DOES NOT HAVE TO BE CONSTRUCTED OUT TO THE EXISTING RIGHT OF WAY LINE, BUT THE VERTICAL CURB FOR THE 6 INCH VERTICAL SEPERATION IS REQUIRED. I CONTACTED THE CONTRACTOR AND ADVISED HIM OF THE CONDITIONS THAT NEED TO BE ADDRESSED PRIOR TO HIS RE-SCHEDULING THE FINAL INSPECTIONS FOR THIS SITE. |
| 08/16/2012 |
ENGINEERING - FINAL |
|
Partial Approval |
A PARTIAL OF THIS SITE IS GIVEN ONLY TO ALLOW CONSTRUCTION ACCESS AND IS NOT INTENDED TO BE GRANTED FOR THE GENERAL PUBLIC. MET WITH THE CONTRACTOR ON THIS SITE AND DISCUSSED SOME OF THE ISSUES THAT I HAVE AT THIS TIME THAT NEED TO BE ADDRESSED BY THE ENGINEER OF RECORD PRIOR TO APPROVAL OF THE SITE. 1) A CONCRETE DRIVEWAY HAS BEEN SHOWN ON THE APPROVED PLAN FOR THE ACCESSIBLE ROUTE, AND ASPHALT DRIVEWAY HAS BEEN PROVIDED. 2) A CMU WALL AND VERTICAL CURB HAS BEEN SHOWN ON THE APPROVED PLANS ALONG THE ABOVE MENTIONED SIDEWALK, BUT IT HAS BEEN PROVIDED UP TO THE FUTURE RIGHT OF WAY ONLY. |