Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2010 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
| 07/27/2010 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) INSTALL BACKING 1) 4" BRANCH TO 2ND CLEANOUT OK 1) PROVIDE UNIFORM FALL ON SEWER PIPING 2) NO BACK PITCH AREAS 1) REMOVE TAPE AT SINGLE TO DBL WALL CONNECTION 2) PROVIDE DOOR THAT DOES NOT HIT GAS PIPING AT WATER HEATER 3) SECURE PIPING AT STOVE AND ON EXTERIOR 4) SEAL PIPE PENETRATION INTO BLDG 5) EXTEND DBL WALL TO 3' ABOVE COOLER WHEN WITHIN 10' OF INTAKE 6) PROVIDE 1" CLEARANCE FROM WOOD AT ROOF PENETRATION FROM VENT 1) POTABLE COPPER PIPING SHALL NOT BE IN CONTACT WITH GALVANIZED METAL 2) SEAL PIPING INSULATION AT JOINTS, FITTING AND PROTECT FROM SUN EXPOSURE 3) PROVIDE LISTING FOR WATER HEATER BASE 4) SEAL LOOP TUING TO E SUPPORTED UP OFF OF ROOF AT CORRECT INTERVALS, NO J-HOOKS THUR ROOF SURFACE 5) PROVIDE CLAMPS THAT DO NOT CRUSH INSULATION 6) PROVIDE CORRECT BREAKER FOR KCAK ENERGY SAVING DEVICE WITH INSTALLATION INSTRUCTION ON SITE 7) TIGHTEN CONNECTORS FOR CONDUIT |