Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 05/26/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL LABELING PER PLANS AND NEC 690 2) #4 & LARGER TO BE PROTECTED FROM DAMAGE AT CONNECTIONS TO PANELS 3) TIE ALL GROUNDING ELECTRODES TOGETHER 4) GROUNDING ELECTRODE CONDUCTORS INSTALLED IN METAL RACEWAYS TO BE BONDED AT BOTH ENDS OF RACEWAY 5) INSTALL UGC-1 CLIPS ON BOTH TOP AND BOTTOM RAILS 6) GROUNDS AND NEUTRALS TO BE SEPERATE IN PV PANEL |