Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/14/2010 |
ENGINEERING - FINAL |
|
Approved |
PER CONVERSATION AT OFFICE/PERMIT COUNTER |
| 05/05/2010 |
ENGINEERING - FINAL |
|
Partial Approval |
CHECKED THE SITE PER THE PREVIOUSLY APPROVED SITE PLAN AND HAVE DETERMINED THAT IT PARTIALLY ACCEPTABLE AT THIS TIME. A FINAL ACCEPTANCE WILL NOT BE GRANTED UNTIL ALL OF THE EXTERIOR HAS BEEN COMPLETED PER THE APPROVED PLANS OR A REVISED DRAWING IS PROVIDED SHOWING THE CHANGES. CURRENTLY THE PLANS SHOW THAT THERE IS TO BE 2 HANDI-CAP ACCESS PARKING SPOTS, ONLY ONE HAS BEEN PROVIDED. I HAVE BEEN ADVISED BY THE DEVELOPER THAT THE ADDITIONAL REMOVAL OF THE HANDICAPPED SPACE HAS BEEN APPROVED BY THE FINAL BUILDING INSPECTOR. I HAVE ADVISED THE DEVELOPER UNLESS THAT IS SHOWN ON AN APPROVED REVISED DRAWING IT IS NOT ACCEPTABLE AT THIS TIME. |