Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 04/27/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED 80A 2 POLE BREAKER FOR SOLAR PANEL LABELED 2) NEED FIRST LB ON ROOF FROM SERVICE CONNECTOR LOSE, SECOND LB TO SOLAR PANEL NEEDS TO BE STRAPPED AND STRUT NEEDS MORE SILICONE |