Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 03/31/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) SUPPORT PIPING ALONG EXTERIOR WALL (GAS PIPING) 2) INSTALL AVB'S ON HOSE BIBBS 3) PROVIDE INSPECTION HISTORY FOR PLUMBING IN THE WALLS 4) EXISTING WATER HEATER HAS BEEN REPLACED. PROVIDE DETAIL FOR CHANGES I.E. EXPANSION TANK, T & P DRAIN, I.E.C.C. REQUIREMENTS FOR INSULATION ETC... |