Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/04/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 02/02/2011 | PLUMBING - ROUGH, SOIL | Denied | provide uniform slope throughout and test lav not located per plan. redline all changes. pvc water and gas piping located under new building shall be relocated. |
|
| 01/06/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) COMBO AT SWR CONNECTS HORIZONTALLY, UNION P TRAP IS NOT ALLOWED TO BE CONCEALED |
|
| 08/02/2010 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE PLUMBING DRAIN INSTALLATION, P TRAP AND FHA DRAIN FOR SHOWER 2) PROVIDE A COMBINATION FITTING AND APPROVED COUPLINGS 3) INSTALL A WYE AND PROVIDE A TEST ON NEW PIPING 4) EXPOSE PIPING AND FITTINGS 5) A FULL SIZED CLEANOUT IS REQUIRED 6) NO PIPING MAY BE EMBEDDED IN CONCRETE |