Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2010 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/17/2010 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) INSULATION TO BE INSTALLED IN A WORKMANSHIP LIKE MANNER CONFORMING TO THE INSTALLATION STANDARD ESTABLISHED BY THE MANUFACTURER 2) AT P.O.C. TO DWV. PIPING TO BE INSTALLED IN PRACTICAL ALIGNMENT WITH NO BACK PITCHED SECTIONS |
|
| 08/12/2010 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* THE PLUMBER HAS NOT FOLLOWED THE PLAN INTO EITHER THE DWV OR THE WATER PIPING. NO REDLINES ON SITE. NO PROVISION MADE FOR INSULATION A BLAKE TEE IS NOT LISTED TO BE INSTALLED IN A HORIZONTAL POSITION ON ITS SIDE N/H TO BE SUPPORTED WITHIN 18" OF EACH COUPLING |