Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2010 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/10/2010 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) ALL P PAGES REQUIRE REVIEWER STAMP (FOUND APPROVAL PAGE) 2) ALL CHANGES TO THE PLAN TO BE REDLINED BEFORE INSPECTION 3) 3" CLEANOUT CUT IN OK-OK TO COVER 4) INTERCEPTOR FILLED OK |
|
| 05/07/2010 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) CORRECTIONS MADE FROM OBSERVATIONAL REPORT, MADE OK WITH NOTED EXCEPTIONS: FILL G.I. TO LID, INSTALL 3" G.C.O. AS REQUIRED, REDLINE ALL CHANGES APPROVED PLAN BEFORE NEXT INSPECTION AND OK TO BACKFILL EXCEPT 3" CLEANOUT CONNECTION |
|
| 04/27/2010 | PLUMBING - ROUGH, SOIL | Denied | 1) MUST TEST INTERCEPTOR ALL THE WAY TO LID 2) INSTALL 2 EACH HAND-SINK AND 1 EACH FLOOR SINK (ON PLAN BUT NOT INSTALLED) 3) FULL SIZE CLEAN-OUTS NEEDED ON 3" AND 4" DRAINS PER (NOT ON PLANS, NEED REVISION) 4) INSTALL BACKWATER VALVE SHOWN ON PLAN 5) INSTALL SEWER VENT FROM BACKWATER VALVE OUTLET (NOT SHOWN ON PLANS) 6) REVISE OR REDLINE PLANS TO SHOW AS-BUILT CONDITION AT NORTH-EAST CORNER (GCO DELETED) 7) REVISE PLAN TO INCLUDE WHATEVER THE 3" TRAP IS SERVICING JUST EAST OF THE RESTROOMS. 8) TRACER WIRE REQUIRED ON ALL SEWER (MISSING FROM INTERCEPTOR TO HCS) 9) VERIFY MINIMUM 1/8" SLOPE ON ALL PIPE. SEVERAL AREAS ARE BACK-PITCHED OR FLAT. 3) |