Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/04/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED |
|
| 05/03/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE COVER AND STRAINER FOR FLOOR SINKS 2) ADD SUPPORT FOR HOSE BIB AT BACK WALL FOR FLOOR SINK 3) REPAIR LEAK AT WATER COOLER 4) COMPLETE DRAIN FOR EYEWASH 5) REPIAR LEAK AT URINAL AND SUPPORT WATER PIPING AT FLASH VALVE 6) PROTECT COPPER PIPING AT SHOCK STOP 7) DAP MOP SINK AND BREAK ROOM SINK 8) COMPLETE CLEANOUT IN FLOOR 9) COMPLETE WORK ABOVE CEILING 10) LIST MAY NOT BE COMPLETE |