Permit: T10CM00414

Parcel: 116231580


Addresses:

870 W 19TH ST

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
06/10/2010 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
1) SPOKE WITH RAOY FOOTING COMPLETE NORTH AND WEST SIDES
06/02/2010 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) OK TO PROCEED
05/25/2010 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) RECALL TO VERIFY 20" LAPS, WILL BE POURED IN SECTIONS
05/14/2010 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REFALL 2/3 OK FRONT PORCH FOOTERS
REFALL 1/3 NOT PER PLAN UNDERPIN AND RECALL PRIOR TO POUR.
05/11/2010 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
STRUCTUAL:
1) PORCH 4 X 8 BEAM ON PLAN NOT WHATS INSTALLED
2) REAR ENCLOSED ROOF, WHAT ARE RAFTERS SIZE DON'T HAVE MINIMUM ROOF PITCH
3) FTGS FOR PORCH AND REAR ROOM BEARING TO BE VERIFIED. SLOPE ON PLAN IS TO THE NORTH
ELECTRICAL:
1) ALL WIRING IS COVERED
2) CIRCUITS NOT LABELED IN SERVICE PANEL
3) AS LIVING SPACE WALL RECEPTS TO FOLLOW SPACING REQUIREMENTS, 6'-0" FROM AN OPENING 12'-0" ON CENTER AFTER THAT
4) CAN'T USE A/C ROOF DISCONNECT AS A JUNCTION BOX FOR BATHROOM CIRCUIT (GFCI AND LIGHTING)
PLUMBING:
1) UNCOVER SEWER LINE AT NEW BATHROOM
2) WHERE IS CLEANOUT FOR THAT BRANCH. HOW WAS BATHROOM PLUMBED (UNDERGROUND) ?, VENTING
3) LOCATE MAIN HOUSE CLEANOUT
4) T & P LINE FOR H20 HTR TERMINATION