Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 04/08/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NEED PRESSURE TEST |
|
| 03/26/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) SIZE GAS LINE, USE TRAC PIPE SCHEDULE 50' COL. 2) BLOCK MECH DUCT 3 SIDES 3) NEW LAUNDRY TUB REQUIRES A VENT, NO S/TRAP 4) HANG TRAC PIPE IN ATTIC |