Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2010 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/18/2010 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DBL FIXTURE FITTING IS NOT LISTED FOR HORIZONTAL INSTALLATION 2) PROVIDE SLOPE AT FIXTURE TRAP ARMS 3) PROVIDE CLEANOUTS SPECIFIED ON THE PLAN 4) BACK WATER VALVE NOT SHOWN ON PLAN, PROVIDE ELEVATIONS OF UPSTREAM M H AND FF |