Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROOF DRAINS
Permit Number - T10CM00252
Inspection Description - PLUMBING - ROOF DRAINS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/25/2011 | PLUMBING - ROOF DRAINS | Approved | IVRS - Inspection :* | |
08/17/2011 | PLUMBING - ROOF DRAINS | Partial Approval | IVRS - Inspection :* 1) STILL NO CHANGE ON THE RAIN LEADERS 2) NO PORTION OF ANY WORK MAYBE CONCEALED UNTIL IT HAS BEEN INSPECTED AND APPROVED. EACH SECTION IS TO BEAR THE MAKERS NAME AND MARK, AND THE CHARACTERISTICS OF THE PIPE 3) RAIN LEADERS COVERED WITHOUT INSPECTION, HAVE THE PAINT REMOVED ON ONE SECTION TO REVEAL THE LISTING. BASED ON THIS SECTION THE REST WILL BE APPROVED NOTE: CONTRACTOR UPSET THAT I YELLED AT HIM, IN FRONT OF WITNESSES 4) GAS PIPING INSTALLED DOWN CORRIDOR INSTALLED IS AMERICAN MADE, CALL FOR GAS INSPECTION 5) 2" N/H DRAIN FROM UPPER LEVEL FOR CONDENSATE TIED INTO S.S. OK 6) ADD P-TRAP AT 2ND FLOOR 7) CONTINUED NOT READYS WILL RESULT IN A REINSPECTION FEE |
|
08/05/2011 | PLUMBING - ROOF DRAINS | Not ready for Inspection | IVRS - Inspection :* 1) OK TO POUR CONCRETE PAD 2) NO CHANGE FROM LAST INSPECTION LEADERS 3) NO PORTION OF ANY WORK MAYBE CONCEALED UNTIL INSPECTED |
|
08/03/2011 | PLUMBING - ROOF DRAINS | Not ready for Inspection | IVRS - Inspection :* 1) AT BATHROOM, CORRECTIONS MADE OK 2) ROOF DRAIN ? PAINTED BEFORE INSPECTION |
|
07/25/2011 | PLUMBING - ROOF DRAINS | Not ready for Inspection | IVRS - Inspection :* |