Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/28/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NOTES FROM 4/6/10 NOT ON SITE NOTES FROM 1/26/10 SHOULD READ: 1) REMOVE HANDKLES OR PROVIDE CAPS ON ALL HOSE BIBS ON SOLAR PANEL LOOP ENA DPIPING THAT COULD CREATE SCALDING IF VALVE ARE OPENED BY MISTAKE 2) STORAGE TANKS REQUIRE PRESSURE AND OR TEMPERATURE AND PRESSURE RELIEF DEVICES WITH APPROVED GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEGREES DOWN ON EXTERIOR 6" TO 24" FROM FINISH GRADE 3) PLEASE READ THE LISTING LABEL ON TOP OF THE NEW TANK |
|
| 04/06/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/29/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/26/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) REMOVE THE HANDLES OR PROVIDE CAPS ON DRAIN DOWN VALVES ON HOT SYSTEM TO AVOID SCALDING 2) PROVIDE A TEMPERATUR & PROCESSING ---- ON STORING TANK GRAVITY DRAIN TO ---- |