Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2010 | ENGINEERING - FINAL | Approved | All items complete. Approved | |
| 07/12/2010 | ENGINEERING - FINAL | Not ready for Inspection | need approved revised site plan before we can final the inspection. remove all temp dumpster and potta potty remove all const. debris and materials raise HC signs to 7ft to bottom of sign. |
|
| 06/15/2010 | ENGINEERING - FINAL | Denied | Gave contractor correction notice for SWPPP controls. Must get site into compliance. |