Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2012 | ENGINEERING - FINAL | Approved | ||
| 04/25/2012 | ENGINEERING - FINAL | Partial Approval | INSPECTIONS PERFORMERED ON 4/23-24/12, FOLLOWING COMMENTS MADE. COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS OR PROVIDE APPROVED AS-BUILT DRAWINGS FOR THIS SITE SHOWING ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. THIS WILL INCLUDE BUT IS NOT LIMITED TOO CHANGES MADE TO SIDEWALKS, LANDSCAPING AREAS AND PLANTS, PARKING LAYOUT AND CALCULATIONS, ACCESS THROUGHOUT THE SITE, EXTERIOR AND INTERIOR BARRIERS, AND ALL OPEN SPACES AND THE DETENTION RETENTION BASIN. |
|
| 04/23/2012 | ENGINEERING - FINAL | Partial Approval | SITE INSPECTION TOO BE COMPLETED WITH COMMENTS TOO FOLLOW. | |
| 08/31/2011 | ENGINEERING - FINAL | Denied | #1COMPLLET INSTALL PER AP PLANS AND AP DETAILS WENT OVER AP PLAN WITH JIM. #2 POVIDE CLEAN SITE AND BASIN . #3 PROVIDE AP DRAINAGE #4 LIST MAY NOT BE COMPLET. |