Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2010 | MECHANICAL - INTERMEDIATE | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE 2) PROVIDE INSECT SCREENS AT COMBUSTION AIR LOUVER ON OUTSIDE WALL AND AT T-TOP ON ROOF |
|
| 05/25/2010 | MECHANICAL - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) TERMINATE CONDENSATE PER PLANS 2) THERE IS NO COMBUSTION AIR FOR FURNACES 3) PROVIDE AS REQUIRED BY CODE 4) ONE OPENING METHOD IS OK |
|
| 05/21/2010 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE CONDENSATE DRAINS TERMINATED TO THE LAV. TAILPIECE IN EACH UNIT PER PLANS. USE PURPLE PRIMER ON ALL FITTINGS PRIOR TO GLUE 2 TERMINATE 3" E.F. DUCT 4" TERMINAL WITH A REDUCER FITTING 3) BE SURE ALL CEILING AND SIDEWALL REGISTER BOXES HAVE BACKING 4) SEAL ALL HOLES IN BOTTOM OF RETURN PLENIUMS WITH NON COMBUSTIBLE MATERIAL 2ND AND 3RD FLOORS |