Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) SUPPORT MIXING VALVES 2) PAINT ROOF PENETRATIONS |
|
| 05/26/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) STERILIZATION WITH DOCUMENTED PROCEEDURE 2) CLEANOUT PLUGS 3) SINK CLIPS 4) INSTALL EXP TANK AFTER CHECK VALVE AT WATER HEATER 5) TEMPERATURE AND HW SIDE VALVE SPECIFIED 6) LAV MIXING VALVES AND BS MIXING |