Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 11/16/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
ITEM COMPLETE |
| 07/19/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
CONTRACTOR IS NOT INSTALLING THE STORMWATER CONTROLS AS PREVIOUSLY DISCUSSED WITH JIM FEMLING. |
| 07/18/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Partial Approval |
Discussed SWPPP controls and placement, will probably move construction entrance to Wilmont. Controls should be in place tomorrow. |