Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T10BU01891

Parcel: 130056860


Addresses:

3035 E 36TH ST


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T10BU01891

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
08/31/2011 GRADING - INTERMEDIATE Approved Approved
08/10/2011 GRADING - INTERMEDIATE Partial Approval Swale for WH area in front of building OK to plant.
08/02/2011 GRADING - INTERMEDIATE Continued Parking lot ready fro paving.
07/29/2011 GRADING - INTERMEDIATE Continued Subgrade base in place, ready to pave.
07/29/2011 GRADING - INTERMEDIATE Partial Approval OK to pur conc. sidewalk from ROW to parking lot.
07/27/2011 GRADING - INTERMEDIATE Continued COntractor began placeing subbase today, I reminded them of the water harvest requirements, he is awhare of them.
07/21/2011 GRADING - INTERMEDIATE Continued Contractor forming sidewalk in front and on side of building, OK to pour, also grading for parking lot, rminded contractor about waterharves areas and grades associated with them.
07/18/2011 GRADING - INTERMEDIATE Partial Approval OK to backfill 12" HDPE pipe for storm.
07/06/2011 GRADING - INTERMEDIATE Continued Site grading will begin this week for the parking lot. Reminded contractor of the water harvest requirements.
06/22/2011 GRADING - INTERMEDIATE Continued All the curb work is complete, work continues on building.
06/14/2011 GRADING - INTERMEDIATE Continued Steel being erected for building, curbing in parking lot under construction.
06/08/2011 GRADING - INTERMEDIATE Continued Curbing for parking lot and water harvest being installed.
05/26/2011 GRADING - INTERMEDIATE Continued Contractor working on building foundation, no site work at this time.
05/19/2011 GRADING - INTERMEDIATE Continued Lot and basin is rough graded, contractor working on foundation and utilities to new building.
05/17/2011 GRADING - INTERMEDIATE Continued Contractor working on building pad, has basin roughed in.
05/12/2011 GRADING - INTERMEDIATE Continued Controls stakes are in contractor cutting for building pad.
05/03/2011 GRADING - INTERMEDIATE Continued No grading activity at this time.