Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2011 | GRADING - FINAL | Approved | Allitems complete approved | |
| 06/24/2011 | GRADING - FINAL | Denied | Received letter from EOR regarding plumbing the roof drains into the storm system. Contractor needs to paint loading zone and install 2 bollards in trash enclouser. |
|
| 06/13/2011 | GRADING - FINAL | Continued | PROVIDE AN STATEMENT FROM THE ENG OF RECORD STATING THAT ALL STORM DRAIN PLUMBING AND TIE-IN TO EXISTING STORM DRAIN LINE WAS COMPLETED PER THE APPROVED PLAN. | |
| 06/10/2011 | GRADING - FINAL | Denied | PROVIDE A STATEMENT FROM THE ENGINEER OF RECORD VERIFYING THAT THE STORM DRAIN SYSTEM INSTALLED ON THE EXTERIOR OF THE BLDG AND CONNECTED TO THE EXISTING SYSTEM WAS CONSTRUCTED PER THE APPROVED PLUMBING PLAN. |