Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T10BU01806

Parcel: 11308208F


Addresses:

2802 N 1ST AV


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T10BU01806

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
04/18/2012 STORMWATER FOLLOW-UP INSP Approved
03/05/2012 STORMWATER FOLLOW-UP INSP Continued 1) VERIFIED THE APPROVED REVISION WAS CONSTRUCTED IN THE FIELD. ALL CHANGES MADE WERE APPROVED BY THE CITY OF TUCSON.
2) STOCKPILE ON SITE, NEED SEDIMENT CONTROLS TO ENSURE SOIL STAYS ON SITE.
3) NEED TO RE-ESTABLISH THE STABILIZED CONSTRUCTION ENTRANCE/EXIT
4) NEED TO SWEEP TRACKING OFF GLENN MORE OFTEN.
02/17/2012 STORMWATER FOLLOW-UP INSP Continued 1) RE-INSTALL SILT FENCE ALONG NW SIDE OF SITE.
2) SWEEP UP TRACKING OFF OF PUBLIC ROADWAY.
02/08/2012 STORMWATER FOLLOW-UP INSP Continued CONTRACTOR COMPLETED STORM PIPE ALONG NORTH SIDE.
GAS CANOPY ROOF DRAIN CONNECTION WILL CHANGE PER THE ENGINEER OF RECORD.

NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
12/14/2011 STORMWATER FOLLOW-UP INSP Continued NO STORM WATER CONCERNS AT THIS TIME, RAINING TODAY
12/06/2011 STORMWATER FOLLOW-UP INSP Continued 1) VERIFY INSTALL OF 150 LF OF 36"X3 SRP ALONG SOUTH SIDE OF SITE.
TRENCH WAS COMPACTED, PIPE WAS BEDDED AND GRADED.
NEOPRENE GASKET USED W/BOLTED COLLAR FOR CONNECTED PIPE.
2) INSTALL SEDIMENT CONTROLS ON S. SIDE OF EAST LOT.
3) INSTALL CONSTRUCTION ENTRANCE AT EACH ENTRANCE/EXIT IN ORDER TO REDUCE TRACKING.
5) REMOVE SOIL FROM CURB LINE
12/01/2011 STORMWATER FOLLOW-UP INSP Continued 1) CONTRACTOR EXCAVATING TRENCH FOR 3-36" SRP PIPES THAT WILL TIE0IN TO AN EXISTING CULVERT (APPROX 145CFS) PICTURES TAKEN.
2) PROVIDE A COPY OF THE PIPE MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR RECORDS.
3) RET/DET BASIN ALONG 1ST AVE BEING ROUGHED IN.
4) ENSURE GLENN ST IS SWEPT ON A ROUTINE BASIS. SWEEP UP TRACKING AS NECESSARY.
11/17/2011 STORMWATER FOLLOW-UP INSP Continued 1) CONTRACTOR INSTALLING SEWER LINE CONNECTION.
2) CONTRCTOR FORMING RETAINING WALL/BLDG BACK WALL ON EAST SIDE.
3) CONTRACTOR ERECTING GAS CANOPY, STEEL WORK FOR CANOPY.
4) TRENCH HAS BEEN ROUGHED IN FOR STORM DRAIN PIPING.
5) CONTINUE TO SWEEP TRACKING OF SOIL OFF PUBLIC ROADWAYS AS APPLICABLE.
6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME