Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T10BU01806
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2012 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/05/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) VERIFIED THE APPROVED REVISION WAS CONSTRUCTED IN THE FIELD. ALL CHANGES MADE WERE APPROVED BY THE CITY OF TUCSON. 2) STOCKPILE ON SITE, NEED SEDIMENT CONTROLS TO ENSURE SOIL STAYS ON SITE. 3) NEED TO RE-ESTABLISH THE STABILIZED CONSTRUCTION ENTRANCE/EXIT 4) NEED TO SWEEP TRACKING OFF GLENN MORE OFTEN. |
|
| 02/17/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) RE-INSTALL SILT FENCE ALONG NW SIDE OF SITE. 2) SWEEP UP TRACKING OFF OF PUBLIC ROADWAY. |
|
| 02/08/2012 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR COMPLETED STORM PIPE ALONG NORTH SIDE. GAS CANOPY ROOF DRAIN CONNECTION WILL CHANGE PER THE ENGINEER OF RECORD. NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
|
| 12/14/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME, RAINING TODAY | |
| 12/06/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) VERIFY INSTALL OF 150 LF OF 36"X3 SRP ALONG SOUTH SIDE OF SITE. TRENCH WAS COMPACTED, PIPE WAS BEDDED AND GRADED. NEOPRENE GASKET USED W/BOLTED COLLAR FOR CONNECTED PIPE. 2) INSTALL SEDIMENT CONTROLS ON S. SIDE OF EAST LOT. 3) INSTALL CONSTRUCTION ENTRANCE AT EACH ENTRANCE/EXIT IN ORDER TO REDUCE TRACKING. 5) REMOVE SOIL FROM CURB LINE |
|
| 12/01/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR EXCAVATING TRENCH FOR 3-36" SRP PIPES THAT WILL TIE0IN TO AN EXISTING CULVERT (APPROX 145CFS) PICTURES TAKEN. 2) PROVIDE A COPY OF THE PIPE MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR RECORDS. 3) RET/DET BASIN ALONG 1ST AVE BEING ROUGHED IN. 4) ENSURE GLENN ST IS SWEPT ON A ROUTINE BASIS. SWEEP UP TRACKING AS NECESSARY. |
|
| 11/17/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR INSTALLING SEWER LINE CONNECTION. 2) CONTRCTOR FORMING RETAINING WALL/BLDG BACK WALL ON EAST SIDE. 3) CONTRACTOR ERECTING GAS CANOPY, STEEL WORK FOR CANOPY. 4) TRENCH HAS BEEN ROUGHED IN FOR STORM DRAIN PIPING. 5) CONTINUE TO SWEEP TRACKING OF SOIL OFF PUBLIC ROADWAYS AS APPLICABLE. 6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |