Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T10BU01806
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2012 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 11/07/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | MET W/ SUPERINTENDENT ( BILL W/BARKER MORISSEY 260-7912) 1) RE-ESTABLISH ROCK ENTRANCE 2) SWEEP TRACKING OFF STONE 3) PROVIDE A DESIGNATED CONCRETE WASH OUT 4) POST A COPY OF YOUR SIGNED NOI 5) PROVIDE CLARIFICATION ON EAST DRAINAGE CHANNEL ( RIP RAP/CONCRETE) 6) IDENTIFY GRADING LIMIT 7) MAINTAIN SEDIMENT CONTROLS AND DOCUMENT SELF INSPECTIONS. 8) PROVIDE CLARIFICATION ON STORM PIPE INSTALLATION FROM YOUR ENG OF RECORD - SPECIFIC DETAILS USED FOR INSTALL |
|
| 11/04/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | SITE VISIT, NOT CALLED IN FOR PRE-CON MEETING. SPOKE WITH SUPERINTENDENT (BILL - BARKER NORRISEY 260-7912), WILL MEET FRI NOV 4TH. 1) RE-ESTABLISH ROCK ENTRANCE 2) SWEEP TRACKING MORE OFTEN OFF 1ST AVE. 3) PROVIDE A DESIGNATED CONCRETE WASH OUT ON SITE 4) POST A COPY OF YOUR SIGNED NOI ON SITE 5) NEED TO SEE LOCATION OF GRADING LIMIT 6) NEED TO SEE STORM DRAIN PIPING PRIOR TO BEING COVERED. 7) ENSURE DRAINAGE CHANNEL ALONG THE EAST SIDE IS CONSTRUCTED PER PLAN ( RIP RAP / CONCRETE ) ? 8) ENSURE STORM WATER COCNTROLS ARE MAINTAINED AND SELF INSPECTIONS ARE DOCUMENTED. |
|
| 10/03/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | SITE HAS BEEN CLEARED, SILT FENCE INSTALLED ALONG THE PERIMETER. NO STABILIZED CONSTRUCTION ENTRANCE/EXIT. NO EQUIPMENT ON SITE. NO PRECON CALLED. BARKER MORRISEY IS CONTRACTOR (JAY) |