| 07/18/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
|
| 05/07/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
GOT WITH RALPH TO PROVIDE SWPPP CONTROLS AROUND THE CAHCH BASIN. |
| 05/04/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
TRASH HAS BEEN REMOVED FROM EAST SIDE OF BUILDING. AND CONTROLS ARE REPAIRED. |
| 03/28/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
AREA ON EAST SIDE OF BUILDING HAS BEEN CLEAN UP . |
| 03/23/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
GOT WITH RALPH ABOUT REPAIRING SWPPP CONTROLS ON EAST SIDE OF SITE. AND PROVIDE WASH OUT FOR PAINT AND DRY WALL MUD. |
| 03/12/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
SMALL AREA OF SWPPP CONTROLS DOWN ON NORTH SIDE OF BUILDING CONTRACTOR NOT ON SITE. |
| 02/23/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
GOT WITH RALPH SWPPP CONTROLS ON EAST SIDE OF JOB SITE. |
| 02/14/2012 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
STORM DRAIN ON EAST SIDE OF JOB SITE.CATCH BASIN NOT INSTALLED YET. |
| 12/07/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
GOT WITH RALPH THE SUPER ABOUT TRACK OUT THAT NEEDS TO BE CLEANED UP. |
| 10/27/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
SWPPP INFO STILL NOT POSTED. |
| 09/13/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
GOT WITH RALPH ABOUT SWPPP REPAIR. |
| 09/07/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 08/25/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 08/23/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
WASH OUT IS ON SITE. |
| 08/22/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
PROVIDE AP WASH OUT .GOT WITH CONTACTOR. |
| 08/05/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 08/03/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
NO CONCERNS TA THIS TIME. |
| 08/01/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
TRACK OUT OK. BUT STILL WORKING IN STREET. |
| 07/25/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
NO CONCERS AT THIS TIMEON SITE OFF SITE TO THE WEST ASTON RUNNING NEW WATER AND SEWER .HAS STOCK PILE THAT NEEDS SWPPP CONTROLS. |
| 07/15/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
WALK THUR WITH PLAN REVIEWER PAUL MACHODO. |
| 07/13/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
GOT WITH RALPH ON SWPPP CONTOLS ON EAST SIDE OF JOB SITE. |
| 07/12/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
PROVIDE PROTECTION FOR ALL STOCK PILES. |
| 07/08/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
NO CONCERNS ATTHIS TIME. |
| 06/30/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
CONTOLS IN PLACE. |
| 06/23/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
PLANS WIHT CHANGES ARE NOT ON SITE . NO PROTECTION FOR STOCK PILE YET. |