Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2012 | GRADING - INTERMEDIATE | Approved | ||
| 03/02/2012 | GRADING - INTERMEDIATE | Continued | SOME SITE WORK , NO CONCERNS AT THIS TIME | |
| 02/15/2012 | GRADING - INTERMEDIATE | Continued | CONTRACTOR HAS NOT CALLED IN FOR SITE INSPECTION. SOME SITE WORK TAKING PLACE |
|
| 02/08/2012 | GRADING - INTERMEDIATE | Continued | CONTRACTOR BEGINING SITE WORK WILL INSPECT PER APPROVED GRADING PLAN. NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
|
| 09/13/2011 | GRADING - INTERMEDIATE | Continued | BULDING BEING BUILT, SECOND BLDG FOUNDATION BEING POURED. NO SITE WORK BEING DONE | |
| 08/19/2011 | GRADING - INTERMEDIATE | Continued | NO SITE WORK BEING DONE AT THIS TIME NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 08/09/2011 | GRADING - INTERMEDIATE | Continued | BUILDING BEING WORKED ON, NO SITE WORK AS OF YET. STORM WATER CONTROLS IN PLACE. SITE IS LESS THAN 1 ACRE. | |
| 04/21/2011 | GRADING - INTERMEDIATE | Continued | NO ACTIVITY - BLDG PAD FAS BEEN COMPACETD, SITE HAS BEEN CLEARED, NO CONTRACTORS ON SITE. | |
| 04/05/2011 | GRADING - INTERMEDIATE | Continued | 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER (SOUTH/WEST) OF THE SITE. 2) A STABILIZED CONSTRUCTION ENTRANCE HAS ALSO BEEN INSTALLED ALONG CAMPBELL AVE. 3) CONTRACTOR MAY NEED TO PLACE GRAVEL BAGS AND/OR WADDLE IN CURB-LINE IN FRONT OF EXISTING CATCH BASIN DURING RIGHT OF WAY WORK. 4) CALL FOR INSPECTION FOR ANY SITE/LANDSCAPE CONCERNS AND/OR CHANGES/REVISIONS W/THE PROJECT. 5) NPPO SHOWS TWO MESQUITE TREES BEING PRESERVED IN PLACE ON SITE. ONE OF THE TWO TREES SHOWN ON THE APPROVED PLAN, APPEARS TO HAVE BEEN KNOCKED DOWN. CONTRACTOR MAY NEED TO SUBSTITUTE ANOTHER MESQUITE ON SITE FOR THE ONE THAT WAS DEMO'D. |