Inspection History Details
Inspection Status: Approved
Inspection History: LANDSCAPE INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2012 | LANDSCAPE INSPECTION | Approved | ||
| 05/31/2012 | LANDSCAPE INSPECTION | Continued | COMPLETE ALL LANDSCAPING PERAP PLANS. PROVIDE APPROVAL FROM COT FOR NPPO CHANGES. | |
| 04/05/2011 | LANDSCAPE INSPECTION | Continued | 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER (SOUTH/WEST) OF THE SITE. 2) A STABILIZED CONSTRUCTION ENTRANCE HAS ALSO BEEN INSTALLED ALONG CAMPBELL AVE. 3) CONTRACTOR MAY NEED TO PLACE GRAVEL BAGS AND/OR WADDLE IN CURB-LINE IN FRONT OF EXISTING CATCH BASIN DURING RIGHT OF WAY WORK. 4) CALL FOR INSPECTION FOR ANY SITE/LANDSCAPE CONCERNS AND/OR CHANGES/REVISIONS W/THE PROJECT. 5) NPPO SHOWS TWO MESQUITE TREES BEING PRESERVED IN PLACE ON SITE. ONE OF THE TWO TREES SHOWN ON THE APPROVED PLAN, APPEARS TO HAVE BEEN KNOCKED DOWN. CONTRACTOR MAY NEED TO SUBSTITUTE ANOTHER MESQUITE ON SITE FOR THE ONE THAT WAS DEMO'D. |