Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER (SOUTH/WEST) OF THE SITE. 2) A STABILIZED CONSTRUCTION ENTRANCE HAS ALSO BEEN INSTALLED ALONG CAMPBELL AVE. 3) CONTRACTOR MAY NEED TO PLACE GRAVEL BAGS AND/OR WADDLE IN CURB-LINE IN FRONT OF EXISTING CATCH BASIN DURING RIGHT OF WAY WORK. 4) CALL FOR INSPECTION FOR ANY SITE/LANDSCAPE CONCERNS AND/OR CHANGES/REVISIONS W/THE PROJECT. 5) NPPO SHOWS TWO MESQUITE TREES BEING PRESERVED IN PLACE ON SITE. ONE OF THE TWO TREES SHOWN ON THE APPROVED PLAN, APPEARS TO HAVE BEEN KNOCKED DOWN. CONTRACTOR MAY NEED TO SUBSTITUTE ANOTHER MESQUITE ON SITE FOR THE ONE THAT WAS DEMO'D. |
|
| 04/01/2011 | ENGINEERING PRE-CONSTRUCTION | Violation | SITE IS NOT REQUIRED TO HAVE A STORM WATER PERMIT, HOWEVER THE SITE MAY BE IN VIOLATION OF THE CITY'S MUNICIPAL STORM WATER ORDINANCE # 10209 - POTENTIAL FOR AN ILLICIT DISCHARGE CAUSING A VIOLATION W/ THE CITY'S MUNICIPAL PERMIT. ALSO THE CONTRACTOR DID NOT CALL IN FOR A PRE-CON MEETING AS STATED ON THE APPROVED GRADING PLAN. 1) ADD TEMP SEDIMENT CONTROLS AROUND STOCKPILED MATERIAL. 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE AT CAMPBELL. 3) INSTALL TEMP SEDIMENT CONTROLS IN CURB-LINE AT CATCH BASIN. 4) SWEEP UP TRACKED SOIL OFF CAMPBELL. COMPLY BY FRIDAY 4/1/11 - NON - COMPLIANCE WILL RESULT IN A STOP WORK ORDER. CRIS - COFFEE CONSTRUCTION 260-3130 331-4868 |