Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2011 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 06/27/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Lot paved swppp controls begining to be removed |
| 06/15/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Contractor has sweeper onsite cleaning up track out. |
| 06/14/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Callewd Chestnut Const. about track out onto Country Club, need to clean up today. |
| 06/08/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
COntrols in place and in good cond. |
| 06/01/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Need to sweep street at water station. |
| 05/19/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
No washout for conctrete, instructed contractor to set up a washout area. |
| 05/05/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
No activity on site. |
| 04/26/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
No activity on site controls in place. |
| 04/14/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls in place and in good cond. |
| 03/07/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Trackout at water truck fill area needs to be swept up. |
| 02/08/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Trackout at water truck fill area neds to swept up. All other controls in good cond. |
| 02/01/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls and construction entrance in place and in good cond. |