Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T10BU01471

Parcel: 14026045A

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T10BU01471

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
10/26/2011 STORMWATER FOLLOW-UP INSP Approved
06/27/2011 STORMWATER FOLLOW-UP INSP Continued Lot paved swppp controls begining to be removed
06/15/2011 STORMWATER FOLLOW-UP INSP Continued Contractor has sweeper onsite cleaning up track out.
06/14/2011 STORMWATER FOLLOW-UP INSP Correction Required Callewd Chestnut Const. about track out onto Country Club, need to clean up today.
06/08/2011 STORMWATER FOLLOW-UP INSP Continued COntrols in place and in good cond.
06/01/2011 STORMWATER FOLLOW-UP INSP Correction Required Need to sweep street at water station.
05/19/2011 STORMWATER FOLLOW-UP INSP Correction Required No washout for conctrete, instructed contractor to set up a washout area.
05/05/2011 STORMWATER FOLLOW-UP INSP Continued No activity on site.
04/26/2011 STORMWATER FOLLOW-UP INSP Continued No activity on site controls in place.
04/14/2011 STORMWATER FOLLOW-UP INSP Continued Controls in place and in good cond.
03/07/2011 STORMWATER FOLLOW-UP INSP Correction Required Trackout at water truck fill area needs to be swept up.
02/08/2011 STORMWATER FOLLOW-UP INSP Correction Required Trackout at water truck fill area neds to swept up. All other controls in good cond.
02/01/2011 STORMWATER FOLLOW-UP INSP Continued Controls and construction entrance in place and in good cond.