Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/09/2013 |
GRADING - INTERMEDIATE |
|
Approved |
|
| 10/02/2013 |
GRADING - INTERMEDIATE |
|
Continued |
CREWS STARTING ON THE PATH PLACEMENT FROM THE NORTHERN MOST RAMADA AND WORKING SOUTH, SHOULD HAVE PATH COMPLETED BY 10/4/2013. |
| 10/01/2013 |
GRADING - INTERMEDIATE |
|
Continued |
MET WITH SUPER AND PROJECT MANAGER ON SITE. APPROVED PAVING OF SECTION OF PEDESTRIAN PATH - AS LONG AS SLOPE REQUIREMENTS ARE MET. |
| 09/25/2013 |
GRADING - INTERMEDIATE |
|
Continued |
CONTRACTOR SCHEDULED THIS FOR INSPECTION BUT IS NOT READY AT THIS TIME. THE RUNNING SLOPES OF THE PEDESTRIAN PATHWAY IS NOT 5% OR LESS, THE CROSS SLOPES APPEAR TO BE CORRECT AT LOCATIONS THAT HAVE BEEN CHECKED. THIS INSPECTION WILL BE SCHEDULED FOR THE FIRST PART OF NEXT WEEK. |
| 09/20/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WALKED SITE WITH DAVE AND BOBBY WORKING ON REMOVING TRAIL THAT SLOPES OVER 2% AND 5%. |
| 09/18/2013 |
GRADING - INTERMEDIATE |
|
Continued |
DEMO WORK ON EAST SIDE OF ROAD TO REMOVE TRAIL. |
| 09/13/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO CHANGE TO TRAIL FROM LAST INSPECTION. |
| 09/09/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY AT THIS TIME STOCK PILES HAVE BEEN REMOVED FROM PARKING AREA. TRAIL FROM PARKING AREA TO ROAD HAS BEEN REOPENED. |
| 09/04/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY AT THIS TIME. |
| 08/29/2013 |
GRADING - INTERMEDIATE |
|
Continued |
CHECKED SLOPES FROM PARKING AREA TO ROAD( ONLY) UNDER 5% RUNNING AND UNDER 2% CROSS SLOPE. |
| 08/26/2013 |
GRADING - INTERMEDIATE |
|
Continued |
CHECKED D.G ON TRAIL FROM PARKING AREA TO ROAD. |
| 08/22/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING DEMO ON TRAIL. |
| 08/16/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO CHANGE TO TRAIL FROM LAST INSPECTION. |
| 07/24/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO CHANGE TO TRAILFROM MEETING. |
| 07/17/2013 |
GRADING - INTERMEDIATE |
|
Continued |
MET WITH GC AND PARKS AND ADA FOR CROSS SLOPE. ON NEW TRIAL. |
| 07/10/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WALKED SITE WITH HOWARD DUTT WITH PARKS AND RECRECTION. AREAS ON WALKING TRAIL ARE OVER 5%ON RUNNING SLOPE AND OVER 2% ON CROSS SLOPE . HOWARD GETTING WITH GC. |
| 06/11/2013 |
GRADING - INTERMEDIATE |
|
Continued |
INSTALLING STEEL FOR COVER ON NEW RAMADAS. |
| 06/04/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON STEEL BEAMS FOR ROOFS. |
| 05/21/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON TOP WALL. |
| 05/14/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON PADS OFF OF TRAIL. |
| 05/06/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON NEXT POUR AROUND 6" POLES. |
| 04/30/2013 |
GRADING - INTERMEDIATE |
|
Continued |
CONCRETE POURED ABOUT 4' UP 6" POLES . |
| 04/23/2013 |
GRADING - INTERMEDIATE |
|
Continued |
FORMING AROUND 6" POLES . |
| 04/11/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON FRAMING ENTRY PLAZA RETAINING WALL. |
| 04/08/2013 |
GRADING - INTERMEDIATE |
|
Continued |
6" POLES SET IN PLACE. |
| 04/03/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WALKED SITE WITH DAVE . NEED REPORT FROM THRID PARTY INSPECTION. |
| 04/02/2013 |
GRADING - INTERMEDIATE |
|
Continued |
GOT WITH GC ABOUT CRACKS IN FOOTERS |
| 03/19/2013 |
GRADING - INTERMEDIATE |
|
Continued |
WALKED SITE WITH BOBBY WENT OVER SWPPP CONTROLS THAT WERE NEEDED. |
| 03/15/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO ONE WORKING ON SITE AT THIS TIME. |
| 02/19/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY AT THIS TIME. |
| 02/05/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY ON SITE. |
| 01/30/2013 |
GRADING - INTERMEDIATE |
|
Continued |
CONTRACTOR NOT ON SITE. |
| 01/28/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY ON SITE. |
| 01/16/2013 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY ON SITE. |
| 12/12/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON PAD AT EAST END OF PARKING AREA. |
| 12/07/2012 |
GRADING - INTERMEDIATE |
|
Continued |
DROPED OFF HAND OUT FROM PER-CON MEETING. |