Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/06/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
Met with LJ McCreary at the site today to discuss NPPO, storm controls and grading activity. I told him we will need a report from the LS Arch regarding the NPPO. We discussed the vertical rock walls, he needs his geo-tech engineer to address wheather treatment is needed and if the swale along the top is necessary. |
| 12/02/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
no pre-con conducted on this site, contractor has been working for about 3 weeks |