Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FINAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2013 | STORMWATER FINAL INSPECTION | Approved | ENSURE TO FILE A NOTICE OF TERMINATION WITH ADEQ | |
| 03/07/2013 | STORMWATER FINAL INSPECTION | Partial Approval | 1) CONTRACTOR AWAITING TO COMPLETE WORK ALONG THE LANDSCAPE BUFFER AT THE WEST SIDE OF THE SITE. 2) NEED TO COMPLETE CONSTRUCTION OF THE WEST ENTRANCE OFF OF HOUGHTON. 3) PROVIDE BASIN/STORM DRAINAGE CERT 4) CPMPLETE HC PARKING AND ACCESS 5) COMPLETE STRIPING 6) COMPLETE INSTALL OF FENCING 7) AN AS-BUILT WAS SUBMITTED 8) FILE (NOT) WITH ADEQ |