Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2012 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) ENSURE THE NPPO IS FOLLOWED TO INCLUDE ALL ASPECTS OF THE APPROVED PLAN SHOWING THE TRANSPLANTING AND PRESERVATION OF NATIVE PLANTS. 2) INSTALL SEDIMENT CONTROLS SHOWN ON YOUR STORWATER PLAN. SOM CHANGES MAY/CAN BE MADE BASED ON THE SITE SPECIFICS - DOCUMENT CHANGES MADE. 3) POST A COPY OF YOUR SIGNED NOI AT ENTRANCE TO THE SITE. 4) SWEEP TRACKING AS NEEDED. 5) INSTALL CONSTRUCTION ENTRANCES SHOWN ON SWPPP. 6) CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS HAVE BEEN INSTALLED. |