Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T10BU01404
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/31/2011 | GRADING - INTERMEDIATE | Approved | Approved | |
03/29/2011 | GRADING - INTERMEDIATE | Correction Required | Water harvest basin in SW corner not deep enough needs to be at least 6", basin in rear if building needs to be completed, conctrete at opening to island in the moddle of parking lot needs to be ground down to allow flow. | |
03/25/2011 | GRADING - INTERMEDIATE | Continued | Site paved, LS underway | |
03/24/2011 | GRADING - INTERMEDIATE | Continued | Met with Contractor, EOR Jef Stanly, and survey this morning to resolve grade issues at entrance off of 22nd street. Jeff suggested that a curb cut be install and scupper under sidewalk to convey storm water from entrance to water harvest area. The water was enteded to go to harvest area, this will be a different route, Jeff will provide an asbuilt when complete. Paving of parking lot began today. | |
03/11/2011 | GRADING - INTERMEDIATE | Continued | Paving contractor off iste, rough graded parking lot, need to check water harvest areas proir to AB placement. | |
03/07/2011 | GRADING - INTERMEDIATE | Continued | Metr with paving contractor, rough grading parking area we discussed water harvest areas and grading for them, will need to inspect prior to paving. | |
02/08/2011 | GRADING - INTERMEDIATE | Continued | Contractor poured bldg floor last week and is standing steel. Site is rough graded. | |
01/18/2011 | GRADING - INTERMEDIATE | Continued | Contractor working on building foundation and plumbing. | |
12/29/2010 | GRADING - INTERMEDIATE | Continued | Grading of site underway. | |
12/22/2010 | GRADING - INTERMEDIATE | Continued | Grading and footing excavation under way. | |
12/14/2010 | GRADING - INTERMEDIATE | Continued | Discused SWPP controls, construction entrance and water harvest inspections with contractor. Removal of existing asphalt underway. | |
12/09/2010 | GRADING - INTERMEDIATE | Continued | Contractor demo existing light poles and conc islands onsite, no grading activity at this time. |