Permit: T10BU01404

Parcel: 124171010


Addresses:

945 E 22ND ST


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T10BU01404

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
03/31/2011 GRADING - INTERMEDIATE Approved Approved
03/29/2011 GRADING - INTERMEDIATE Correction Required Water harvest basin in SW corner not deep enough needs to be at least 6", basin in rear if building needs to be completed, conctrete at opening to island in the moddle of parking lot needs to be ground down to allow flow.
03/25/2011 GRADING - INTERMEDIATE Continued Site paved, LS underway
03/24/2011 GRADING - INTERMEDIATE Continued Met with Contractor, EOR Jef Stanly, and survey this morning to resolve grade issues at entrance off of 22nd street. Jeff suggested that a curb cut be install and scupper under sidewalk to convey storm water from entrance to water harvest area. The water was enteded to go to harvest area, this will be a different route, Jeff will provide an asbuilt when complete. Paving of parking lot began today.
03/11/2011 GRADING - INTERMEDIATE Continued Paving contractor off iste, rough graded parking lot, need to check water harvest areas proir to AB placement.
03/07/2011 GRADING - INTERMEDIATE Continued Metr with paving contractor, rough grading parking area we discussed water harvest areas and grading for them, will need to inspect prior to paving.
02/08/2011 GRADING - INTERMEDIATE Continued Contractor poured bldg floor last week and is standing steel. Site is rough graded.
01/18/2011 GRADING - INTERMEDIATE Continued Contractor working on building foundation and plumbing.
12/29/2010 GRADING - INTERMEDIATE Continued Grading of site underway.
12/22/2010 GRADING - INTERMEDIATE Continued Grading and footing excavation under way.
12/14/2010 GRADING - INTERMEDIATE Continued Discused SWPP controls, construction entrance and water harvest inspections with contractor. Removal of existing asphalt underway.
12/09/2010 GRADING - INTERMEDIATE Continued Contractor demo existing light poles and conc islands onsite, no grading activity at this time.