Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T10BU01404
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/31/2011 | STORMWATER INSTALL OF CONTROLS | Approved | Approved | |
12/29/2010 | STORMWATER INSTALL OF CONTROLS | Continued | sitl fence along west proiperty installed, construction entrance not installed yet. | |
12/22/2010 | STORMWATER INSTALL OF CONTROLS | Correction Required | Asphalt from the old parking lot has been removed and excavation for the footing has begun, erosion controls are not installed, I told the contractor that they must be installed today. We agreed that a temp swale and earth berm can be dug today while waiting for straw waddel to arrive. | |
12/14/2010 | STORMWATER INSTALL OF CONTROLS | Continued | Coontractor will install straw waddel when asphalt is removed along west property line. | |
12/09/2010 | STORMWATER INSTALL OF CONTROLS | Continued | No grading actibvity onsite, demo only |