Permit: T10BU01343

Parcel: 11615088L

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Permit Number - T10BU01343

Inspection Description - ENGINEERING PRE-CONSTRUCTION

Inspection Status - Approved

Date Description Inspector Results Comments
01/03/2011 ENGINEERING PRE-CONSTRUCTION Approved 1) MET WITH SUPERINTENDENT (JIM CASEBOLT - LLOYD CONSTR), DISCUSSED THE JOB. CONTRACTOR WILL CONSTRUCT A STEM WALL AND GENERATOR PAD.
2) CONTRACTOR MUST COMPLETE ALL WORK PER APPROVED PLAN FOR FINAL APPROVAL.
3) CONTRACTOR MUST CLEAN OUT STORM WATER CATCH BASIN PRIOR TO FINAL.
4) AN ELEVATION CERTIFICATION IS REQUIRED PRIOR TO FINAL GRADING APPROVAL.
09/24/2010 ENGINEERING PRE-CONSTRUCTION Prior to Intermediates EL Cert required for concrete pads for equipment and generator. Submit El Cert to PDSD prior to placement of generator and electrical equipment.