Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T10BU01343
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/03/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) MET WITH SUPERINTENDENT (JIM CASEBOLT - LLOYD CONSTR), DISCUSSED THE JOB. CONTRACTOR WILL CONSTRUCT A STEM WALL AND GENERATOR PAD. 2) CONTRACTOR MUST COMPLETE ALL WORK PER APPROVED PLAN FOR FINAL APPROVAL. 3) CONTRACTOR MUST CLEAN OUT STORM WATER CATCH BASIN PRIOR TO FINAL. 4) AN ELEVATION CERTIFICATION IS REQUIRED PRIOR TO FINAL GRADING APPROVAL. |
|
09/24/2010 | ENGINEERING PRE-CONSTRUCTION | Prior to Intermediates | EL Cert required for concrete pads for equipment and generator. Submit El Cert to PDSD prior to placement of generator and electrical equipment. |