Inspection Status: Approved
Inspection History: GRADING - TIER REV
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2012 |
GRADING - TIER REV |
|
Approved |
|
| 05/08/2012 |
GRADING - TIER REV |
|
Continued |
REVISION #3 includes adding bleed pipes to 2 south basins between bldgs 5&6 and 6&7. As discused with RICK Engineering Brian Chimera P.E. 8MAY12, at project completion, as-builts will be required to be submitted prior to final approval. -EL |
| 11/02/2011 |
GRADING - TIER REV |
|
Not ready for Inspection |
|
| 10/24/2011 |
GRADING - TIER REV |
|
Revision |
2ND REVISION: Sheets C1, C3, C4, C6, C10, X1.1, & L2.0. Minor grading and drainage improvements, including adding wall openings at various locations, wider s/w at drop-off area - 5-ft changed to 8-ft wide s/w, service yard patio area layout changed, ramadas adjusted, added roof drains, grading for drainage revised near b-ball court, and relocating WH tank. - 24OCT11 |
| 10/14/2011 |
GRADING - TIER REV |
|
Continued |
|