Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2012 |
GRADING - INTERMEDIATE |
|
Approved |
|
| 12/02/2011 |
GRADING - INTERMEDIATE |
|
Continued |
|
| 11/18/2011 |
GRADING - INTERMEDIATE |
|
Continued |
|
| 11/08/2011 |
GRADING - INTERMEDIATE |
|
Continued |
CANCELD BY JOHN WITH SUNT DO TO RAIN. |
| 11/02/2011 |
GRADING - INTERMEDIATE |
|
Continued |
|
| 10/13/2011 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON GRADING MIDDLE OF BUILDING #5. |
| 08/01/2011 |
GRADING - INTERMEDIATE |
|
Continued |
4'' PVC OVER FLOW PIPE FROM RAIN WATER HARVESTING TANK TO EAST SIDE OF DRIVEWAY OK. |
| 07/12/2011 |
GRADING - INTERMEDIATE |
|
Continued |
GRADING ON WEST SIDE OF BUILDING. |
| 02/03/2011 |
GRADING - INTERMEDIATE |
|
Partial Approval |
OK to pour Cb type 4 in courtyard. |
| 02/02/2011 |
GRADING - INTERMEDIATE |
|
Continued |
Ok to pour collar at transition between RCP and SRP pipe, also ok to pour base for type 4 CB |
| 02/01/2011 |
GRADING - INTERMEDIATE |
|
Continued |
Contractor placing 18" RCP between bldg 4 and 5, OK to backfill. Also forming base for MH between Bldg 4 & 5. |
| 01/31/2011 |
GRADING - INTERMEDIATE |
|
Continued |
OK to backfill 18" SRP from outlet to first MH between Bldg 4 and 5. |
| 11/04/2010 |
GRADING - INTERMEDIATE |
|
Continued |
DROVE THROUGH THE SITE AND CHECKED TO SEE WHAT WORK IS CURRENTLY UNDERWAY. CREWS ARE STILL WORKING ON THE EXCVATING, GRADING, REBAR PLACEMENT, AND POURING THE BUILDING FOOTERS ON THE NORTHSIDE OF THE SITE. THERE HAS BEEN SOME MINOR BLOWING DUST ON THIS SITE DO TO THE HEAVIER THAN USUAL WINDS, BUT THE CONTRACTOR IS TRYING TO ADDRESS IT WITHOUT CAUSING TO MUCH WET GRADE . I HAVE ADVISED O-LEARY'S CREW OF THIS SO THAT THEY CAN MAINTAIN IIT ENOUGH TO PREVENT ADEQ FROM HAVING TO BE CALLED TO THE SITE. THE DIRT IN THE ROADWAYS FROM THIS SITE APPEARS TO BE VERY MINIMAL AND THAT THEY ARE ADDRESSING THINGS IN THE MANNER AS DISCUSSED PREVIOUSLY DURING THEIR HAULIN PHASE. |