Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2012 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 11/08/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
|
| 11/02/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
|
| 10/13/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
JAYS REPORT ON SITE. |
| 07/27/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
JAY WORKING ON SWPPP CONTOLS. |
| 07/22/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
WALKED SITE WITH JAY KNOLL WENT OVER CONTROLS AND CLEAN UP TO WORK ON. |
| 07/12/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
|
| 11/04/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
DROVE THROUGH THE SITE AND CHECKED TO SEE WHAT WORK IS CURRENTLY UNDERWAY. CREWS ARE STILL WORKING ON THE EXCVATING, GRADING, REBAR PLACEMENT, AND POURING THE BUILDING FOOTERS ON THE NORTHSIDE OF THE SITE. THERE HAS BEEN SOME MINOR BLOWING DUST ON THIS SITE DO TO THE HEAVIER THAN USUAL WINDS, BUT THE CONTRACTOR IS TRYING TO ADDRESS IT WITHOUT CAUSING TO MUCH WET GRADE . I HAVE ADVISED O-LEARY'S CREW OF THIS SO THAT THEY CAN MAINTAIN IIT ENOUGH TO PREVENT ADEQ FROM HAVING TO BE CALLED TO THE SITE. THE DIRT IN THE ROADWAYS FROM THIS SITE APPEARS TO BE VERY MINIMAL AND THAT THEY ARE ADDRESSING THINGS IN THE MANNER AS DISCUSSED PREVIOUSLY DURING THEIR HAULIN PHASE. MINOR CORRECTIONS MAYBE NEEDED IF THEY DO NOT GET THE DUST UNDER CONTROL. |