Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2011 | GRADING - INTERMEDIATE | Approved | ||
| 02/02/2011 | GRADING - INTERMEDIATE | Continued | SITE WORK BEING DONE PER PLAN, NO CONCERNS OR PROBLEMS AT THIS TIME. NO STORM WATER CONCERNS |
|
| 01/14/2011 | GRADING - INTERMEDIATE | Continued | CONTRACTOR IS INSTALLING NEW SIDEWALK FOR ACCESS TO ROW. EXISTING SIDEWALK DOES NOT MEET CURRENT ADAAG/ANSI FOR HC ACCESSIBILITY. NO STORM WATER CONCERNS AT THIS TIME |
|
| 01/13/2011 | GRADING - INTERMEDIATE | Continued | POURING THE SOUTHSIDE SIDEWALK, WILL BE SUBMITTING AS-BUILT DRAWINGS FOR THE CHANGES IN LOCATIONS FROM THE APPROVED PLANS. | |
| 12/22/2010 | GRADING - INTERMEDIATE | Continued | CONTRACTOR ADDING TO EXISTING SIDEWALK ALONG SOUTH SIDE OF PROJECT. NEW SIDE WILL MEET ADAAG/ANSI EXISTING SIDEWALK CROSS SLOPE IS >2%. CONTRACTOR KNOWS AND HAS LET MANAGEMENT KNOW. NOTHING IS SHOWN ON APPROVED PLANS | |
| 12/15/2010 | GRADING - INTERMEDIATE | Continued | 1) TOOK PICTURES OF STORM WATER CONNECTION OF TRUNK LINE TO EXISTING CATCH BASIN. - OK TO COVER 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 3) ENSURE STORM WATER SELF MAINT. INSPECTIONS AR E PERFORMED AND DOCUMENTED PER YOUR PLAN. 4) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF ROADWAYS AS NEEDED. 5) CALL FOR INSPECTION FOR ANY CHANGES, CONCERNS OR QUESTIONS. |
|
| 12/09/2010 | GRADING - INTERMEDIATE | Continued | TOOK PICTURES OF STORM WATER CATCH BASINS THAT HAVE BEEN POURED. CONTRACTOR WORKING ON BLDG, NO OTHER SITE WORK AT THIS TIME. NO STORM WATER CONCERNS AT THIS TIME. |
|
| 12/02/2010 | GRADING - INTERMEDIATE | Continued | 1) RE-BAR WAS INSTALLED FOR CATCH BASINS, CONCRETE NOT POURED YET 2) PROPER SIZE PIPE AND MATERIAL CALLED OUT ON PLANS WAS USED ON SITE. STORM DRAIN PIPE HAS BEEN GRADED TO DRAIN. 3) NO STORM WATER CONCERNS AT THIS TIME |
|
| 11/30/2010 | GRADING - INTERMEDIATE | Continued | 1) ENSURE STORM DRAIN CATCH BASINS AR EINSTALLED USING THE STD DETAILS CALLED OUT ON THE APPROVED GRADING PLANS. 2) ENSURE RE-BAR IS INSTALLED IN EACH CATCH BASIN AS SHOWN ON PLANS. 3) ENSURE PROPER GRATE IS USED FOR EACH CATCH BASIN. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |