Permit: T10BU01167

Parcel: 10511061G


Addresses:

4620 N ORACLE RD

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
02/23/2011 GRADING - INTERMEDIATE Approved
02/02/2011 GRADING - INTERMEDIATE Continued SITE WORK BEING DONE PER PLAN, NO CONCERNS OR PROBLEMS AT THIS TIME.
NO STORM WATER CONCERNS
01/14/2011 GRADING - INTERMEDIATE Continued CONTRACTOR IS INSTALLING NEW SIDEWALK FOR ACCESS TO ROW. EXISTING SIDEWALK DOES NOT MEET CURRENT ADAAG/ANSI FOR HC ACCESSIBILITY.
NO STORM WATER CONCERNS AT THIS TIME
01/13/2011 GRADING - INTERMEDIATE Continued POURING THE SOUTHSIDE SIDEWALK, WILL BE SUBMITTING AS-BUILT DRAWINGS FOR THE CHANGES IN LOCATIONS FROM THE APPROVED PLANS.
12/22/2010 GRADING - INTERMEDIATE Continued CONTRACTOR ADDING TO EXISTING SIDEWALK ALONG SOUTH SIDE OF PROJECT. NEW SIDE WILL MEET ADAAG/ANSI EXISTING SIDEWALK CROSS SLOPE IS >2%. CONTRACTOR KNOWS AND HAS LET MANAGEMENT KNOW. NOTHING IS SHOWN ON APPROVED PLANS
12/15/2010 GRADING - INTERMEDIATE Continued 1) TOOK PICTURES OF STORM WATER CONNECTION OF TRUNK LINE TO EXISTING CATCH BASIN. - OK TO COVER
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
3) ENSURE STORM WATER SELF MAINT. INSPECTIONS AR E PERFORMED AND DOCUMENTED PER YOUR PLAN.
4) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF ROADWAYS AS NEEDED.
5) CALL FOR INSPECTION FOR ANY CHANGES, CONCERNS OR QUESTIONS.
12/09/2010 GRADING - INTERMEDIATE Continued TOOK PICTURES OF STORM WATER CATCH BASINS THAT HAVE BEEN POURED.
CONTRACTOR WORKING ON BLDG, NO OTHER SITE WORK AT THIS TIME.
NO STORM WATER CONCERNS AT THIS TIME.
12/02/2010 GRADING - INTERMEDIATE Continued 1) RE-BAR WAS INSTALLED FOR CATCH BASINS, CONCRETE NOT POURED YET
2) PROPER SIZE PIPE AND MATERIAL CALLED OUT ON PLANS WAS USED ON SITE. STORM DRAIN PIPE HAS BEEN GRADED TO DRAIN.
3) NO STORM WATER CONCERNS AT THIS TIME
11/30/2010 GRADING - INTERMEDIATE Continued 1) ENSURE STORM DRAIN CATCH BASINS AR EINSTALLED USING THE STD DETAILS CALLED OUT ON THE APPROVED GRADING PLANS.
2) ENSURE RE-BAR IS INSTALLED IN EACH CATCH BASIN AS SHOWN ON PLANS.
3) ENSURE PROPER GRATE IS USED FOR EACH CATCH BASIN.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.