Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - REBAR
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2011 | GRADING - REBAR | Approved | ||
| 12/02/2010 | GRADING - REBAR | Continued | 1) RE-BAR WAS INSTALLED FOR CATCH BASINS, CONCRETE NOT POURED YET 2) PROPER SIZE PIPE AND MATERIAL CALLED OUT ON PLANS WAS USED ON SITE. STORM DRAIN PIPE HAS BEEN GRADED TO DRAIN. 3) NO STORM WATER CONCERNS AT THIS TIME |