Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2011 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 02/02/2011 | STORMWATER FOLLOW-UP INSP | Continued | SITE WORK BEING DONE PER PLAN, NO CONCERNS OR PROBLEMS AT THIS TIME. NO STORM WATER CONCERNS |
|
| 01/14/2011 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR IS INSTALLING NEW SIDEWALK FOR ACCESS TO ROW. EXISTING SIDEWALK DOES NOT MEET CURRENT ADAAG/ANSI FOR HC ACCESSIBILITY. NO STORM WATER CONCERNS AT THIS TIME |
|
| 01/13/2011 | STORMWATER FOLLOW-UP INSP | Continued | SIDEWALK BEING INSTALLED TO MEET THE CURRENT SPECIFICATIONS FOR HANDICAP ACCESS THROUGH THE SITE. | |
| 12/09/2010 | STORMWATER FOLLOW-UP INSP | Continued | TOOK PICTURES OF STORM WATER CATCH BASINS THAT HAVE BEEN POURED. CONTRACTOR WORKING ON BLDG, NO OTHER SITE WORK AT THIS TIME. NO STORM WATER CONCERNS AT THIS TIME. |
|
| 12/02/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) ENSURE STORM DRAIN CATCH BASINS AR EINSTALLED USING THE STD DETAILS CALLED OUT ON THE APPROVED GRADING PLANS. 2) ENSURE RE-BAR IS INSTALLED IN EACH CATCH BASIN AS SHOWN ON PLANS. 3) ENSURE PROPER GRATE IS USED FOR EACH CATCH BASIN. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
| 12/02/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) RE-BAR WAS INSTALLED FOR CATCH BASINS, CONCRETE NOT POURED YET 2) PROPER SIZE PIPE AND MATERIAL CALLED OUT ON PLANS WAS USED ON SITE. STORM DRAIN PIPE HAS BEEN GRADED TO DRAIN. 3) NO STORM WATER CONCERNS AT THIS TIME |
|
| 11/24/2010 | STORMWATER FOLLOW-UP INSP | Continued | THE SITE WAS CHECKED TO SEE WHAT TYPE OF WORK HAS BEEN COMPLETED. CURRENTLY THE STORMWATER CONTROLS HAVE BEEN PLACED ALONG THE WEST SIDE OF THE SITE. I WILL TRY TO MEET WITH JOSE ON 11/29/2010 AND DISCUSS THE FUTURE WORK TO VERIFY WHETHER ADDITIONAL CONTROLS WILL BE NEEDED. THERE ARE NO CONCERNS AT THIS TIME. |