Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) INSTALL WADDLE (SILT SOCK) ALONG NORTH PERIMETER OF SITE WHERE RETAINING WALL ENDS. EXTEND WADDLE ALONG ENTIRE WEST END AND SOUTH SIDE APPROXIMATELY HALF WAY UP. 2) ENSURE SILT SOCK IS INSTALLED PROPERLY PER PLAN AND IS MAINTAINED THROUGHOUT CONSTRUCTION. 3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER YOUR STORM WATER PLAN. 4) SWEEP UP TRACKED SOIL ON A ROUTINE BASIS. 5) INSTALL A CONCRETE/MATERIALS WASHOUT WHEN NEEDED. 6) PERFORM ROUTINE STORM WATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM CALL FOR ANY CONCERNS, CHANGES, AND/OR QUESTIONS WITH SITE WORK. |