Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2012 | GRADING - FINAL | Approved | ||
| 02/24/2012 | GRADING - FINAL | Denied | AWAITING AS-BUILT DRAWINGS, RET/DET BASIN CERTIFICATION FROM THE ENGINEER OF RECORD AND COMPLETION OF ALL LISTED CONDITIONS UNDER THE PERMIT. | |
| 01/25/2012 | GRADING - FINAL | Continued | 1) LOOKED AT FORMS FOR SIDEWALK SCUPPER/SPILLWAY AT NORTHWEST SIDE OF BASIN, PER STD 205.5. CONTRACTOR WILL POUP CONCRETE TOMORROW. 2) ENSURE SIDE WALK ACCESS SLOPE ALONG WEST SIDE OF BLDG DOES NOT EXCEED 5%. 3) LANDSCAPE CONTRACTOR PLANTING TREES. I WILL INVENTORY EACH AND COMPARE TO THE APPROVE LANDSCAPE PLAN. 4) CONTRACTOR PREPARING SUBGRADE FOR PAVING ALONG THE WEST SIDE OF THE BLDG. 5) ENSURE ALL SIGNIFICAT CHANGES TO THE APPROVED SITE/GRADING PLAN ARE SHOWN ON THE REVISED PLAN AND THAT PLAN HAS BEEN REVIEWED AND APPROVED BY THE CITY OF TUCSON, ALSO MAKE THAT PLAN AVAILABLE FOR THE FINAL GRADING INSPECTION. 6) PRIOR TO FINAL APPROVAL OF THE GRADING PERMIT, ALL SITE WORK MUST BE COMPLETED PER THE MOST CURRENT APPROVED GRADING PLAN. 7) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL STORM DRAINAGE WAYS WERE CONSTRUCTED PER THE APPROVED GRADING PLAN. |