| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2012 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 01/14/2012 | STORMWATER FOLLOW-UP INSP | Continued | SOME TRACKOUT NOTED IN THE STREETS FROM THE TRUCK MOVEMENT, THIS WILL BE ADDRESSED WHEN MIKE RETURNS ON 01/18/2012 SINCE THE PRIME CONTRACTOR IS NOT ONSITE AT THIS TIME. | |
| 01/06/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) LOOKED AT SIDEWALK LAYOUT ALONG WEST SIDE OF BLDG. ENSURE RUN SLOPES ARE NO > 5%, ACCESS RAMP SLOPES NO > 8.3%. 2) CURB HAS BEEN POURED ALONG WEST SIDE OF BLDG. NO ADDITIONAL STORM WATER CONCERNS AT THIS TIME. |
|
| 12/30/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) INSPECTED LAYOUT OF VEHICLE BARRIER SYSTEM AT THE EAST GATE - A MANUFACTURER REPRESENTATIVE WAS ON HAND. 2) CURBING WAS BEING POURED FOR THE WEST SIDE OF THE SITE. 3) TERRA-CON IS THE QA/QC CONTRACTOR. CUT SHEETS, SURVEY NOTES, AND COMPACTION TESTS RESULTS ARE AVAILABLE THROUGH THEM. 4) LOTS OF TRACKING STILL ALONG THE ADJACENT ROADWAY. NO OTHER STORM WATER CONCERNS AT THIS TIME |
|
| 12/15/2011 | STORMWATER FOLLOW-UP INSP | Continued | SITE VERY WET, NO CONSTRUCTION. RAINED YESTERDAY | |
| 12/14/2011 | STORMWATER FOLLOW-UP INSP | Continued | INSPECTION CANCELLED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SITE IS NOT PAVED | |
| 12/06/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) CURB BEING POURED ALONG EAST BOUNDRY OF SITE. 2) LOTS OF TRACKED MUD OFF SITE. SWEEP COMMERCE PARK LOOP. 3) VERY LITTLE SITE WORK COMPLETED ALL STORM DRAIN PIPING IN PLACE. |
|
| 11/29/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) ANY SIGNIFICANT CHANGES MADE TO THE APPROVED GRADING PLAN , MUST BE REVIEWED AND APPROVED BY THE CITY OF TUCSON. 2) SUBGRADES BEING SET FOR PAVING ALONG EST SIDE OF SITE. STRING-LINE SET FOR CURBING. 3) UNDERGROUND STORM PIPE INSTALLED AT MAIN ENTRANCE TO SITE (NW). 4) A CERT STATEMENT FROM THE ENG OF RECORD IS REQUIRED PRIOR TO GRADING PERMIT FINAL APPROVAL. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. 6) A RIGHT OF WAY PERMIT IS REQUIRED FOR WORK IN THE PUBLIC ROW FROM THE DEPT OF TRANSPORTATION. |
|
| 11/22/2011 | STORMWATER FOLLOW-UP INSP | Continued | STOP BY THE SITE LATE, SITE WAS LOCKED AND UNABLE TO SEE WHAT HAD BEEN COMPLETED TODAY. MIKE RUSSO WILL RECHECK THE SITE ONCE HE RETURNS ON 11/28/2011. | |
| 11/21/2011 | STORMWATER FOLLOW-UP INSP | Continued | MET WITH ERNIE TO LOOK OVER WHAT WAS BEING DONE ON THIS SITE TODAY, THEY HAVE INSTALLED 100 PLUS FEET OF 18 " S.R.P. SOUTH OF THE ENTRYWAY INTO THE SITE TO AN AREA NORTH OF THE SOUTH END OF THE SECURITY TRAILOR. THEY WILL BE CONTINUING THE PLACEMENT AND BACK FILL TOMORROW ALONG WITH THE PPOURING OF AN A.D.O.T COLLAR AT THE PIPE JUNCTION STRUCTURE SOUTH OF COMMERCE PARK LOOP. I WILL TRY TO RE-INSPECT THE SITE ON 11/22/2011. | |
| 11/10/2011 | STORMWATER FOLLOW-UP INSP | Continued | SITE IS STILL UNDER A STORM WATER PERMIT UNTIL PAVED, AND MUST USE BMP'S TO ENSURE SOIL/CONSTR MATERIAL STAYS ON SITE. (AZPDES/CLEAN WATER ACT) 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG N. PERIMETER 2) DO A BETTER JOB REMOVING SOIL FROM PUBLIC ROADWAY. 3) ENSURE A DESIGNATED CONCRETE/MATERIAL WASH-OUT IS ON SITE AND USED 4) RE-ESTABLISH A STABILIZED ENTRANCE 5) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM |
|
| 08/26/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) INSPECTION CALLED IN TO TAKE A LOOK AT THE CURB BEING POURED ALONG THE EAST PERIMETER - NO CONCERNS 2) TOOK A LOOK AT THE TRASH ENCLOSURE IN THE SAME AREA. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
| 07/18/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) SRP TO CONCRETE HEADWALL TIE-IN BEING INSTALLED. 2) CONTRACTOR HAS SET FORMS AND WALL POUR COLLAR FOR PIPE CONNECTION. 3) PIPE IS LAST SECTION OF CONNECTION BETWEEN RET/DET BASIN AND EXISTING DRAINAGE CHANNEL - OK TO COVER 4) NO SIGNIFICANT STORM WATER CONCERNS |
|
| 07/14/2011 | STORMWATER FOLLOW-UP INSP | Continued | ONTRACTOR DIGGING UTILITY TRENCH ALONG NORTH PERIMETER OF THE PROJECT. STORM DRAIN PIPE TIE-IN FROM RET/DET BASIN TO HEAD WALL ALONG EXISTING DRAINGE CHANNEL HAS NOT BEEN COMPLETED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 07/07/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) AZ UNDERGROUND EXCAVATING TRENCH FOR 12" PVC STORM PIPE FROM NE CATCH BASIN TO RET/DET BASIN TIE-IN. 2) STOCKPILE ALONG SE CORNER MAY NEED ADDITIONAL TEMP SEDIMENT CONTROLS DURING THE AZ RAINY SEASON. 3) ENSURE CONCRETE AND MATERIALS FROM CONSTRUCTION ARE NOT WASHED INTO THE RET/DET BASIN. |
|
| 06/23/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) NO CHANGES SINCE LAST INSPECTION. 2) AZ UNDERGROUND DIGGING MORE TRENCH ALONG NE PERIMETER. 3) COLLAR FOR STEEL TO CONCRETE PIPE CONNECTION WILL BE POURED NEXT WEEK - PIPE CONNECTION MUST BE CERTIFIED BY THE ENGINEER OF RECORD STATING IT WAS CONSTRUCTED PER THE APPROVED PLANS. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 06/09/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME | |
| 06/08/2011 | STORMWATER FOLLOW-UP INSP | Continued | MET W/ CONTRACTOR (AZ UNDERGROUND), INSPECTED SECTION OF 12" PVC STORM DRAIN ALONG EAST SIDE OF NEW BLDG. DOWN SPOUT/ROOF DRAIN CONNECTIONS - OK TWO CATCH BASINS INSTALLED PER PLAN - OK OK TO BURY SECTION OF PIPE. ENSURE GRADES ARE MET AND TRENCH IS COMPACTED PER PLAN. NO STORM WATER CONCERNS AT THIS TIME |
|
| 06/07/2011 | STORMWATER FOLLOW-UP INSP | Continued | MET WITH AZ UNDERGROUND (SUBCONTRACTOR) TO INSPECT STORM DRAIN PIPING INSTALLED FROM BLDG ROOF DRAINS TO RET/DET BASIN/ AND THE BLEED PIPE FROM THE BASIN TO THE EXISTING DRAINAGE CHANNEL. 1) APPROX 80' OF 6" PVC BRANCH LINES AND 12" PVC TRUNK LINE HAS BEEN INSTALLED TO INCLUDE 12" RISERS FOR CLEANOUTS. 2) FERNCO COUPLINGS WERE USED FOR 6" DUCTILE IRON ROOF DRAINS TO PVC CONNECTION. 3) PIPE TRENCHES HAVE BEEN BEDDED, ENSURE ALL GRADES ARE MET PER THE APPROVED GRADING PLAN. 4) OK TO BURY EXISTING WORK, CALL FOR RE-INSPECTION PRIOR TO TIE-IN TO RET/DET BASIN. 5) NO STORM WATER CONCERNS AT THIS TIME |