Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH, WEST, AND NE CORNER OF SITE. 2) CONTROLS HAVE ALSO BEEN PLACED AROUND STOCKPILED MATERIAL ON SITE. 3) ENSURE SEDIMENT CONTROLS ARE INSPECTED AS REQUIRED BY YOUR STORM WATER PLAN AND ALL INSPECTIONS ARE DOCUMENTED. 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE PROJECT. 5) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS AS NECESSARY. A STABILIZED CONSTRUCTION ENTRANCE MAY BE REQUIRED AT A LATER TIME. 6) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT WHEN NEEDED. 7) CALL FOR RE-INSPECTION FOR ANY QUESTIONS OR CONCERNS OR FOR A FINAL GRADING INSPECTION. |